Industrial-grade epoxy primer with good filling power that can be overcoated with most paint products. Can be applied directly to: iron, aluminum, galvanized iron and light alloys, fiberglass, plastics. Suitable for artifacts and cycles in rural and urban environments.
Iron surfaces: SA2 sandblasting or thorough mechanical cleaning followed by degreasing with solvents. Hot-dip Galvanized Steel: Light sandblasting or alternatively sanding or buffing followed by degreasing with solvent Aluminum: Mechanical cleaning by sandblasting (where possible), sanding or buffing followed by degreasing with solvents. Copper and brass: Remove any traces of oxidation by sanding or buffing followed by degreasing with solvents. Thermosetting resins: Degreasing with solvents.
Comp. A: 190.A7035 100 parts by weight 3 parts by Volume Comp. B: CZ.105 or CZ.110 20 parts by weight 1 part by Volume Alternatively (*): CZ.104 20 parts by weight 1 part by Volume (*) Iron only. For large areas and/or cabin temperature > 30 °C, we recommend D.130 Slow thinner, which ensures excellent spreading and reabsorption Over spray. Mix to uniform consistency and color; dilute with our D.150 epoxy thinners to optimum viscosity depending on the application system and/or thickness to be achieved. Applicable with conventional spray systems, Airmix and Airless.
Two-component
Matte
Gray
1,54 Kg/Lt (± 0,05)
16” ±3 FORD 8 at 25°C
74.44% (±2)
Dry dust-free Print-free: 4-5 hours. 15’ - 20’ Print-free 5 hours Drying 24 - 36 hours at 20 °C Forced Drying 30’ - 40’ at 60 - 80 °C
A cross coat
70 - 100 µm
6,7 m2/Lt or 4,7 m2/Kg at 80 µm dry
6 hours. The pot-life decreases at higher temperatures
With CZ.104: minimum 6 hours maximum 36 hours. With CZ.110/ CZ.155: minimum 3 hours maximum 24 hours. After 48 hours, light sanding of the film is recommended to ensure good adhesion of the top coat.
Strictly follow the instructions on the labeling and in the safety data sheet.
The storage room must be dry and with a temperature between + 10°C and +35 °C. Rev.: 07/23 The data and information contained in this sheet are the result of our experience and accurate laboratory tests. However, since the painting process represents a set of operations that are beyond our control, they do not therefore guarantee, in any way, the final performance of the cycle.
The data and information contained in this sheet are the result of our experience and accurate tests and laboratory tests.
However, since the painting process is a set of operations that are beyond our control, they therefore do not constitute, in any way any form of guarantee on the final performance of the cycle itself.
792.70701
ANCHOR GRIGIO - FONDO ACRILICO 2K
VERNICI CALDART SRL © 2022 | P.IVA IT00759630965 | Privacy Policy | Cookies Policy | Ethical Code | Whistleblowing | Financing | SOFTWEB