General use, machine tools, industrial machinery, agricultural machinery and metal shelving
View in the preparation of the support
Iron surfaces: Remove any traces of rust, grease, calamine and humidity by means of thorough mechanical cleaning, followed by degreasing. Apply one coat of our EPOXY 2K Primer series 193 or 190, our SINTOFLEX series 494 or 490. After 6/12 hours apply NITRO enamel. Aluminum: Degreasing with organic solvents, followed by sanding. Apply a coat of EPOXY 2K Primer (series 193 or 190). Galvanized sheet: Pretreat with adhesion promoter Z.030. Apply a coat of epoxy primer 193.
Comp. A : 533.90900 100 parts by weight Thinner : D.525/D.535 40 - 50 parts by weight Compatible with electrostatic application systems.
Nitro-Synthetic 1K
Matt
White
1,03 Kg/l (± 0,10)
18’ DIN 8 at 25 °C (± 2”) SOLID % - VOLUME 34% (± 2%) SOLID % - WEIGHT 44% (± 2%)
Dry dust-free: 15’ - 20’ Touch-free: 2 - 3 hours Complete curing: 24 h
2
30 - 40 µm
9,1 m2/Kg-Lt at 40 µm dry
After 1-2 hours, with the same product
View pictograms Page 1.
Strictly follow the instructions on the labeling and in the safety data sheet.
In unopened and sealed packages, kept at a temperature of +5 to +30 °C. Rev.: 01/24 The data and information contained in this sheet are the result of our experience and accurate laboratory tests. However, since the painting process represents a set of operations that are beyond our control, they do not therefore guarantee, in any way, the final performance of the cycle.
The data and information contained in this sheet are the result of our experience and accurate tests and laboratory tests.
However, since the painting process is a set of operations that are beyond our control, they therefore do not constitute, in any way any form of guarantee on the final performance of the cycle itself.
VERNICI CALDART SRL © 2022 | P.IVA IT00759630965 | Privacy Policy | Cookies Policy | Ethical Code | Whistleblowing | Financing | SOFTWEB